El contenido de esta página requiere una versión más reciente de Adobe Flash Player.

Obtener Adobe Flash Player

Would you wish to suscribe newsletters?

newsletters



Receive HTML?


Saturday, 19 May, 2012

REFIT OF THE S/Y AIGLON 44m LOA

Work-list:
aiglonDuring the month of November 2010 the following works are started:

Electricity: Replacement of all the existing electrical wiring and panels. Installation of a domotics system based on KNX technology. Installation of an automatic coupling and weight distribution system of the auxiliary engines.

Carpentry: Replacement of the bridge and lounge windows adapted to the Lloyd’s regulations.

Interior Design: Refurbishment of the main lounge furniture.

Painting: Painting of the superstructure with Awl-Grip system.