Refits and Projects
REFIT OF THE SAMURAI ONE![]() Work-list: Painting: Painting of hull and superstructure with Awlgrip coating. Naval mechanics: Stripping of axles and rudders. Metalwork: Modification to the superstructure and a change of the location of the life rafts. |
Haul out of M/Y YAAKUN of 62.25m loa![]() Work-list: Painting: Painting of bottom of hull and polishing of dead works. Naval Mechanics: Replacement of shafts, bearings and couplings, control of all valves, sea-cocks and tanks. Engines: W3 control of main MTU engines.
REFIT OF THE S/Y AIGLON 44m LOAWork-list:
Complete refit of a 142 feet Perini NaviWorks carried out on Yacht: ![]() Rigging: Dismasting and complete control of rigging, sails and ropes. Painting: Painting of hull, superstructure and masts with Awl-Grip. To carry out the painting works a marquee was built which covered the boat completely and another one for the masts and booms. A daily humidity and temperature control was carried out inside the marquees to ensure a perfect finish.
|


During the month of November 2010 the following works are started: